Basic GigaVUE H Series Connections and Configuration

This chapter describes how to establish your first configuration session with the GigaVUE‑HC2 and set the basic initial configuration options necessary to get the node up and running.

Refer to the following sections for details:

■   Grounding the GigaVUE‑HC2 Chassis
■   Connecting Power to the GigaVUE‑HC2
■   Fan Trays
■   Connecting Serial Console and Mgmt Ports
o   Connecting -48V DC Power Supplies
■   Configuring Basic GigaVUE H Series Settings
o   Access the Command-Line Interface over the Console Port
o   Run the Jump-Start Script
o   Configure Modules and Enable Ports
■   Command-Line Basics
o   Command-Line Modes
o   Entering Commands in the CLI
o   Command-Line Syntax – Entering Commands
■   The Basic Commands
■   Completing the Initial GigaVUE H Series Setup