Configure VXLAN Tunnel Termination

Before creating a VXLAN tunnel termination, refer to the VXLAN Tunnel Termination—Rules and Notes.

The following table summarizes the required tasks to configure a VXLAN tunnel for decapsulating the traffic:

 

S.No

Task

Refer to...

1.

Configure the required circuit port.

Configure Ports

2.

Configure an IP interface and attach the circuit port that you created in task 1.

Configure IP Interface

3.

Configure a VXLAN tunnel for decapsulation and attach the IP interface that you created in task 2. Ensure that you select the Type as VXLAN.

Create Tunnel

4

Create a VXLAN group for a device and add all the VXLAN IDs that are specific to the device.

Create VXLAN / L2GRE Group

5.

Configure a map to decapsulate the traffic. Ensure that you add the IP interface that you created in task 2 as the source of the map and specify the required pass/drop rule in the map to filter the traffic based on inner packet attributes or VXLAN ID for the template configured.

Create a New Map